Cheap price modern house entrance main iron gate designs

FOB Reference Price:Get Latest Price
US $78.12-161.29 / Set | 1 Set/Sets cheap price modern house entrance main iron gate designs (Min. Order)
Supply Ability:
1000 Set/Sets per Month cheap price modern house entrance main iron gate designs
Port:
GUANGZHOU/SHENZHEN
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Morrison-cheap price modern house entrance main iron gate designs
Model Number:
Morrison-G101
Material:
Iron, Wrought iron
Open Style:
Swing
Opening Pattern:
Manual Control
Color:
Customization
Glass:
Double tempered glass
Antirust process::
Hot zinc galvanize
Hardware:
locks and hinges
Craft:
Pure manual, perfect welding, grinding,polishing and painting
Market:
USA, Australia,Canada
Quality:
100% quality insurance
Design:
Any customization
packing:
Wooden and bubble wrap
Packaging & Delivery
Packaging Details
Outer in 3CM standard wooden crate,inner in plastic or foam;
Delivery Time
Shipped in 20 days after payment

Cheap price modern house entrance main iron gate designs

Product Name
Cheap price modern house entrance main iron gate designs
Material
Hot-dip Galvanized steel or Aluminum material is available
Lead Time
15-20 Days
Payment terms
T/T or L/C or Western Union
Packing
Pearl cotton, carton box, wooden box, etc
Color
Customization
Hardware
locks and hinges
Design
Any customization
Antirust process
Hot zinc galvanize
QualityGlass
Double tempered glass
Quality
100% quality insurance


 

                  We are specialized many facturing enterprise integrating research, design,manufacture

                       and sales of all aluminum or iron windows and doors, wrought iron windows

                                                     and doors, wrought iron gates curtain wlls.

      

       What is the MOQ quantity?

       

          1. MOQ is 1 set.

          2. The standard size is 6 feet wide and 8 feet high.

          3. The custom size is not enough for one square meter to be calculated in one square meter.

 

         How long is the production time?

         

         Total production time is 20 days include

         1. Drawing making 3 days.

         2. Modification and confirmation 3 days.

         3. Door assembly 5 days.

         4. Galvanized layer made 3 days.

         5. Paint baked 3 days.

         6.Toughened glass customization 3 days.

         7. Packing wooden box custom custom 1 day.

 

         How many forms of payment?

 

          1. First recommended through alibaba.com letter of order transactions,  there will be trade protection.

          2. Support Western Union.

          3. T / T.

          4. HSBC Bank account.

 

          Transaction process.

           1. Choose the style.

           2. Confirm the details and size.

           3. Provide the quotaion and invoice.

           4. Complete the payment.

           5. Make and confirm the drawings.

           6. Start production, complete the production, confirm the details again.

           7. Start packing and shipping.

           8. Start the port of Guangzhou  Whampoa to reach the port of destination.

           9. When the goods arrive, we need to contact the freight company to help us to pick up the  goods.